LOFT BOARDING.

This project followed an emergency call-out after a ceiling collapse caused by items being stored on insulation in an unboarded loft. We installed a proper loft boarding system above the insulation to create a safe, load-bearing storage area while maintaining thermal performance and preventing further damage.

New studs were fitted from inside the loft space to create fixing points for the new plasterboard before repair works began.

    1. Emergency attendance following ceiling collapse caused by items stored on insulation within an unboarded loft space.

    2. Inspection of the loft area to identify unsafe storage conditions and assess suitability for boarding.

    3. Safe clearance of stored items from affected areas of the loft.

    4. Installation of raised loft boarding system to provide a stable, load-bearing surface suitable for storage.

    5. Boarding installed above insulation to prevent compression and maintain thermal performance.

    6. Completion of works to leave the loft space safe, accessible, and fit for use.

Previous
Previous

Retail Fit Out Project